  The following is a select list of our past projects:
  Worldport @ DIA
Denver, Colorado
Project One prepared and implemented a complete contractor selection process including contract negotiations and finalizing of the GMP for the World Port at DIA project. This is a $55 million development including the construction of 6 buildings totaling more than 500,000 sq. ft. of office, retail and air cargo space along with significant air side and land side infrastructure. As the project was under a considerably tight schedule, the Owner realized they needed the best resources to implement a selection process as deadlines with the City of Denver were quickly approaching. Working with the entire design team and Owner, Project One was able to compile the volumes of documents previously developed by various designers, consultants and managers into a managed project scope which was essential in order to implement a highly detailed and accurate RFP process, which allowed World Port @ DIA to select a contractor, finalize contract language and agree to a Guaranteed Maximum Price, on time and within the original project budget.

Contact: Jonathan D. Griffis, Vice President


The Board of Denver Water Commissioners
Denver, Colorado

Providing leadership and training for the Denver Water staff and Board of Water Commissioners in establishing a project approach to complete the $130 million Non-potable Reuse Project.

Our Phase 1 Services included assisting the entire Denver Water team in selecting and implementing a construction delivery method for their largest project currently underway. In this role we developed tools to educate the staff and designers in the numerous delivery methods and identified the advantages and disadvantages of each. The team selected a CM/GC approach with a Guaranteed Maximum Price. We led the staff through development and implementation of; contractor solicitations, RFQ’s, RFP’s, pre-qualifications, interviews, reference checks, selection of the contractor and contract negotiations.

Since Denver Water had always completed work through a conventional design/bid/build delivery method, we worked with several departments to assure their alignment with this new approach. Our role included developing a new contract format with the legal department, revising accounting procedures, developing an auditing strategy, developing new procurement procedures, developing engineering approaches to the pre-construction and the development of several partial guaranteed maximum prices leading to a final project guaranteed maximum price. We also assisted in establishing changes to the contract administration procedures during construction. Our role has been to develop the CM/GC delivery approach and train Denver Water staff in understanding and implementing the new procedures.

This approach has received overwhelming support and as a result The Board of Water Commissioners approved this approach for the construction of the $30 million Marston Treatment Plant renovation.

Contacts: Mr. Chips Barry, Commissioner Bill Roberts

CEAVCO Audio Visual Company. Inc.
Lakewood, Colorado

Provided guidance and direction to an audio/visual company that was being displaced from a redevelopment area in Lakewood, Colorado. We assisted our client in determining the project requirements including size of structure, possible expansion requirements and future exit strategies. We evaluated options for purchasing existing structures & renovating versus constructing a new building. Our responsibilities included evaluating the feasibility of each option, creating proforma’s and establishing a total project development schedule and selection of designers & contractors. We also assisted this client in preparing their overall moving strategy from the existing location to the new building. We created tools to manage the process as well as prepared the RFP for selection of a moving company.

Contact: Mr. Matt Emerson

Jackpot Springs Casino
Blackhawk, Colorado

Complete Owner Representative Services for a 600,000 sq. ft. casino and parking structure. This unique project was being planned with an unwavering commitment to the visitors experience and was designed to be the most highly finished Casino in Colorado. There were many challenges including coordination with numerous public entities such as; the City of Black Hawk, Gilpin County, CDOT, FEMA and the State of Colorado. The total project budget is $190 million and all work has been planned to be completed within 25 months including the temporary re-routing of Highway 119 and the removal of more than 600,000 cu. yds. of rock.

As Owner Representatives, our services included; significant participation in the development of the design documents within the project budget, value engineering work sessions, contract negotiations with the designers and general contractor, review of proposed subcontractors, develop/implement management tools for the Owners total project budget, review and approval of project schedules, direct supervision of the contractor’s field activities, participation in weekly Owner/Architect/Contractor meetings, reviews of RFI’s, ASI’s, change orders, contingency control, payment applications, retention, look ahead schedules, total project development scheduling, contract resolution and numerous other tasks required in creating a path to assure the success of this project.

Contact: Mr. Mark Hemmeter

Il Campanile- Residential Lofts
Greenwood Village, Colorado

Owner Representative Services, for the design, and construction of a highly finished 23-story loft/retail project in Fiddler’s Green Center. Our role is to coordinate the designers and contractor as well as interface with the occupants who will be spending several million dollars for each unit. As Owner Representative, we establish the project approach and manage the contract negotiations with the designers and contractor to assure the proper alignment of accountability and responsibility throughout the project. We lead team meetings and directed efforts to assure that the project design evolves timely within the budget and of the quality level envisioned by the owners.

Contact: Mr. J. Madden

Fiddler’s Green II
Greenwood Village, Colorado

Owner Representative Services for the planning, design and coordination of various tenants moving into the 200,000 sq. ft. speculative office building. Our responsibility is to work with each tenant through the Architect and Contractor selection process, contract negotiations, pricing, construction and close-out of each tenant finish project. In addition to these activities, we manage the owner’s building stock items including standard TI building materials and existing modular furniture stock. Project One, positively representing the owner at all times, works to make the process as simple, timely and cost effective for the tenants.

Contact: Mr. J. Madden

Piggly Wiggly Lofts
Denver, Colorado

Owner Representative Services for the complete planning and design of a high-rise urban mixed use project that includes 94 high end lofts, commercial office space, retail and a parking structure for 450 cars. The Piggly Wiggly lofts, is located within ½ block of the main entrance to Coors Field. Project One lead the Ownership team by conducting weekly meetings, attending design coordination meetings, providing a contractor selection process which ended in an executed GMP contract and overall guidance with regard to marketing and risk management. Due to economic circumstances the project was placed on hold following completion of the 50% Construction Documents.

Contact: Mr. Bill Hanzlik

Additional Program Management/Owner Representative Services
In addition to our recent work through Project One Integrated Services we have often provided program management and owner representative services to clients as an extension of our construction management services for a wide range of projects. A sampling of additional relevant services includes:

Melick Associates- Project Evaluation, risk analysis and development of management tools for the completion and closeout of a $40 million casino project. The contact is Chip Melick.

Denver Tech Center- Project Closeout for projects in the Denver Technological Center working with Peter Culshaw.

Centura Health- Initial planning and coordination with local municipalities in Frisco, Colorado for limited site improvements. The contact is Bob Wallace.

Empire Construction-
Worked to develop educational materials to assist clients in determining and structuring the best delivery methods for upcoming construction work. The contacts are Charles and/or Bill Roberts.

  Project One Integrated Services - We will create a customized path to get you there. For more information call us at: (303) 771-0396
   
  Previous Page  
Projec t Management Leadership
Commercial Construction Lender Resource
Permit Administration
Project Closeout
Customized Owner Resource